Scholar

Steef van de Velde

Dean RSM & Professor of Management and Technology

Dean's Office

Rotterdam School of Management (RSM)

Erasmus University Rotterdam

Centres of Expertise


1.任职单位
Erasmus University Rotterdam

2.科研工作经历

Dean,Rotterdam School of Management, Erasmus University,2011.9-

Professor of Operations Management &Technology,Rotterdam School of Management, Erasmus University,1997.5-

Vice Dean,Rotterdam School of Management, Erasmus University,2008.9-2011.9

ScientificDirector,DINALOG, Dutch Institute for Advanced Logistics,2009.11-2010.7

Associate Professor,Rotterdam School of Management, Erasmus University,1997.5-2001.1

Assistant professor,Faculty of Mechanical Engineering, University of Twente,1993-1997.5

Visiting Researcher,Rotman School of Management,1992-1993

Assistant Professor,School of Industrial Engineering, University of Twente,1990.10-1992.6

Personal Introduction

  • Profile

    Steef van de Velde is a professor of operations management and technology and the dean of Rotterdam School of Management, Erasmus University (RSM).


    His research interests lie in the areas of operations excellence, service operations, and supply chain management.


    He has published in the leading academic journals including, among others, the Management Science, the California Management Review, Operations Research, Mathematical Programming, the INFORMS Journal on Computing, IIE Transactions, and the Journal of Scheduling.


    Professor van de Velde holds an MSc in econometrics from the Erasmus School of Economics and a PhD in mathematics and computer science from the Eindhoven University of Technology.

    Professional experience

    Dean

    Erasmus University Rotterdam

    Rotterdam School of Management

    Full Professor

    Erasmus University Rotterdam

    Rotterdam School of Management

    Publications

    Professional Publications (7)

    • Schippers, M.C., Rook, L. & Velde, S.L. van de (2011). Crisis performance predictability in supply chains. RSM Insight, 7 (3), 10-11.

    • Huijsman, M.J., Hillegersberg, J. van, Moonen, J.M., Velde, S.L. van de, Becker, J.F.F. & Verduyn, T. (2003).Intelligent Agents in supply chains: An explorative study. (Extern rapport, Project MG - 21, no MG-02.224). Delft, the Netherlands: Connekt.

    • Velde, S.L. van de, Zijm, W.H.M. & Assen, M.F. van (2001). De onoverkomelijkheden van de MRP-paradigma: planning biinen een tijdgebaseerde versus kostengebaseerde bedrijfsvoering. Bedrijfskunde, 73 (4), 55-64.

    • Cachet, A., Oskam, M.R.A., Peereboom, L.S., Velde, S.L. van de & Sluis, A. van (2000). Tussen beleid en uitvoering. Operationele inzetplanning bij de politie Rotterdam-Rijnmond. (Extern rapport). Rotterdam: EBSC.

    • Gademann, N. & Velde, S.L. van de (1997). Positioning autoated guided vehicles in a loop layout. (Intern rapport, Management Report Series, no 31(13)). : ERIM.

    • Hoogeveen, J.A. & Velde, S.L. van de (1997). A single machine scheduling model for coordinating logistics activities in a simple supply chain. (Intern rapport, Management Report Series, no 30(13)). : ERIM.

    • Wang, M., Sethi, S., Sriskandarajah, C. & Velde, S.L. van de (1997). Minimizing makespan in flowshops with pallet requirements: computational complexity. (Intern rapport, Management Report Series, no 32(13)). : ERIM.

    Scholarly Publications (35)

    • Gong, Y., Zhang, X., Zhou, S., Koster, M.B.M. de & Velde, S.L. van de (2016). Increasing the Revenue of Self-Storage Warehouses by Optimizing Order Scheduling. European Journal of Operational Research, Accepted. doi: http://dx.doi.org/10.1016/j.ejor.2015.12.044

    • Srour, F. Jordan & Velde, S.L. van de (2013). Are Stacker Crane problems easy? A statistical study. Computers and Operations Research, 40 (3), 674-690. doi: http://dx.doi.org/10.1016/j.cor.2011.06.017[go to publisher's site]

    • Zhang, Xiandong & Velde, S.L. van de (2012). Approximation Algorithms for the Parallel Flow Shop Problem.European Journal of Operational Research, 216 (3), 544-552. doi: http://dx.doi.org/10.1016/j.ejor.2011.08.007[go to publisher's site]

    • Alfieri, A, Glass, C.A. & Velde, S.L. van de (2012). Two-machine lot streaming with attached setup times. IIE Transactions, 44 (8), 695-710. doi: http://dx.doi.org/10.1080/0740817X.2011.649384[go to publisher's site]

    • Hans, E.W. & Velde, S.L. van de (2011). The Lot Sizing and Scheduling of Sand Casting Operations.International Journal of Production Research, 49 (9), 2481-2499. doi: http://dx.doi.org/10.1080/00207543.2010.532913[go to publisher's site]

    • Zhang, X. & Velde, S.L. van de (2010). On-line Two-machine Job Shop Scheduling with Time Lags. Information Processing Letters, 100 (12-13), 510-513.

    • Zhang, X. & Velde, S.L. van de (2010). Polynomial-time Approximation Schemes for Scheduling Problems with Time Lags. Journal of Scheduling, 13 (5), 553-559. doi: http://dx.doi.org/10.1007/s10951-009-0134-8

    • Zhang, X. & Velde, S.L. van de (2010). On-line two-machine open shop scheduling with time lags. European Journal of Operational Research, 204 (1), 14-19. doi: http://dx.doi.org/10.1016/j.ejor.2009.09.023[go to publisher's site]

    • Alfieri, A, Velde, S.L. van de & Woeginger, G.J. (2007). Roll cutting in the curtain industry, or: A well-solvable allocation problem. European Journal of Operational Research, 183 (3), 1397-1404. doi: http://dx.doi.org/10.1016/j.ejor.2005.11.065[go to publisher's site]

    • Alfieri, A, Kroon, L.G. & Velde, S.L. van de (2007). Personnel scheduling in a complex logistic system: a railway application case. Journal of Intelligent Manufacturing, 18 (2), 223-232. doi: http://dx.doi.org/10.1007/s10845-007-0017-9

    • Hoogeveen, H., Norden, L. van & Velde, S.L. van de (2006). Lower bounds for minimizing total completion time in a two-machine flow shop. Journal of Scheduling, 9 (6), 559-568. doi: http://dx.doi.org/10.1007/s10951-006-8789-x

    • Norden, L. van, Nunen, J.A.E.E. van & Velde, S.L. van de (2006). A winner determination problem of tendering transportation services. Zeitschrift fur Betriebswirtschaft, 76 (2), 125-138.

    • Gademann, N. & Velde, S.L. van de (2006). Order batching to minimizing total travel time in a parallel-aisle warehouse. IIE Transactions, 37 (1), 63-75. doi: http://dx.doi.org/10.1080/07408170590516917[go to publisher's site]

    • Norden, L. van & Velde, S.L. van de (2005). Multi-product lot-sizing with a transportation capacity reservation contract. European Journal of Operational Research, 165 (1), 127-138. doi: http://dx.doi.org/10.1016/j.ejor.2003.04.008[go to publisher's site]

    • Akker, M.A. van den, Hoogeveen, J.A. & Velde, S.L. van de (2005). Applying column generation to machine scheduling. In G Desaulniers & J Desrosiers (Eds.), Column Generation (pp. 303-330). Berlin: Springer.

    • Alfieri, A, Velde, S.L. van de & Woeginger, G.J. (2005). Roll cutting in the curtain industry. In Algorithms - ESA 2005 Lecture Notes in Computer Science (pp. 283-292). Springer.

    • Krikke, H.R. & Velde, S.L. van de (2004). Product Modularity and the Design of Closed-Loop Supply Chains.California Management Review, 46 (2), 23-39.

    • Koning, R.H., Sierksma, G. & Velde, S.L. van de (2003). Introduction: Sport and Computers. European Journal of Operational Research, 148 (2), 231-232. doi: http://dx.doi.org/10.1016/S0377-2217(02)00679-3

    • Hezewijk, A.P. van & Velde, S.L. van de (2003). The impact of innovation and organizational factors on APS adoption: Evidence from the Dutch discrete parts industry. (Intern rapport, ERIM Research Series in Management, no 2003-084). : .

    • Congram, R.K., Potts, C.N. & Velde, S.L. van de (2002). An iterated dynasearch algorithm for the single-machine weighted tardiness problem. INFORMS Journal on Computing, 14, 52-67.

    • Faber, N., Koster, René de & Velde, S.L. van de (2002). Linking warehouse complexity to planning and control structure. International Journal of Physical Distribution and Logistics Management, 32 (5), 381-395. doi: http://dx.doi.org/10.1108/09600030210434161

    • Akker, M.A. van den, Hoogeveen, H. & Velde, S.L. van de (2002). Combining column generations and Lagrangean relaxation: an application to a single-machine common due date scheduling problem. INFORMS Journal on Computing, 14, 37-51.

    • Assen, M.F. van, Hans, E.W. & Velde, S.L. van de (2000). An agile manufacturing planning and control framework for customer-order driven discrete manufacturing environments. International Journal of Agile Management Systems, 2 (1), 16-23.

    • Gademann, N. & Velde, S.L. van de (2000). Positioning Automated Guided Vehicles in a Loop Layout.European Journal of Operational Research, 127 (3), 565-753. doi: http://dx.doi.org/10.1016/S0377-2217(99)00341-0[go to publisher's site]

    • Akker, M.A. van den, Hoogeveen, J.A. & Velde, S.L. van de (1999). Parallel machine scheduling by column generation. Operations Research, 47 (6), 863-872. doi: http://www.jstor.org/stable/222976

    • Sethi, S., Sriskandarajah, C., Velde, S.L. van de, Wang, M. & Hoogeveen, H. (1999). Minimizing makespan in a pallet-constrained flowshop. Journal of Scheduling, 115-134.

    • Hoogeveen, J.A. & Velde, S.L. van de (1998). Scheduling by positional completion times: analysis of a two-stage flow shop. Mathematical Programming, 82, 273-289.

    • Brucker, P., Gladky, A., Hoogeveen, J.A., Kovalyov, M.Y., Potts, C.N. & Velde, S.L. van de (1998). Scheduling a batching machine Online ISSN: 1099-1425. Journal of Scheduling, 1, 31-54.

    • Velde, S.L. van de (Ed.). (1998). Journal of Scheduling.

    • Velde, S.L. van de & Kubiak, W. (1998). Scheduling with deteriorating jobs. Naval Research Logistics, 511-523.

    • Hoogeveen, J.A. & Velde, S.L. van de (1997). Earliness-tardiness scheduling around almost equal due dates.INFORMS Journal on Computing, 9 (1), 92-99.

    • Wang, M., Sethi, S., Sriskandarajah, C. & Velde, S.L. van de (1997). Minimizing makespan in flowshops with pallet requirement: computational complexity. Operations Research, 35 (4), 277-285.

    • Hoogeveen, J.A. & Velde, S.L. van de (1997). Scheduling with target start times. In W.K. Klein Haneveld, O.J. Vrieze & L.C.M. Kallenberg (Eds.), Ten years LNMB Ph.D. research and graduate courses of the Dutch Network of Operation Research (Centrum voor Wiskunde en Informatie CWI/TRACT, 122) (pp. 45-53). Amsterdam: Stichting Mathematisch Centrum.

    • Wang, M., Sethi, S. & Velde, S.L. van de (1997). Minimizing makespan in a class of reentrant shops.Operations Research, 45 (5), 702-712.

    • Hoogeveen, J.A., Lenstra, J.K. & Velde, S.L. van de (1997). Sequencing and scheduling. In M. Dell'Amico & F. Maffioli (Eds.), Annotated bibliographies in combinatorial optimization (Interscience series in discrete mathematics and optimization) (pp. 181-197). Chichester: Wiley.

    Other Output (6)

    • Congram, R.K., Potts, C.N. & Velde, S.L. van de (1999). An iterated dynasearch algorithm for the single-machine total weighted tardiness scheduling problem. (Intern rapport, Management Report Series, no 04-1999). : .

    • Velde, S.L. van de & Hoogeveen, J.A. (1998). Combining column generation and lagrangean relaxation. An application to a single-machine common due date scheduling problem. (Intern rapport, Management Report Series, no 36-1998). : ERIM.

    • Meester, G.J., Schutten, J.M.J., Velde, S.L. van de & Zijm, W.H.M. (1998). Shop floor scheduling in discrete parts manufacturing. (Intern rapport, Management Report Series, no 50-1998). : .

    • Wang, M., Sethi, S., Sriskandarajah, C., Velde, S.L. van de & Hoogeveen, J.A. (1998). Minimizing makespan in a pallet-constrained flowshop. (Intern rapport, Management Report Series, no 52-1998). : .

    • Velde, S.L. van de (1998). A time-based planning & control framework for discrete parts manufacturing environments. (Intern rapport, Management Report Series, no 35-1998). : ERIM.

    • Velde, S.L. van de (1998). Production planning and scheduling of a cast-to-stock metal foundry. (Intern rapport, Management Report Series, no 37-1998). : ERIM.

    Recognitions

    Editorial positions

    • Operations Research Letters

    Special Section Editor

    • Journal of Scheduling

    Editor

    Side positions

    • Dinalog - The Dutch Institute for Advanced Logistics

    Scientific Director